So, we had to wait a week and a half for the rest of the shower. The walls are installed and ready for the plumber. Unfortunately, the toilet and sink can't go in until the tile floor is down. So, no sense calling in the plumber just yet. And the tiler can't come yet. We hurried to get the moulding put in this weekend in anticipation of the tile going in early this week. We can't install the sliding door until the floor is down. And the door must be in before the cabinet is installed. And the cabinet must go in before the washer and dryer. And on and on...
No comments:
Post a Comment